Single and double-storey extensions, delivered from first drawings to final handover.

Overview

Single and double-storey extensions, delivered from first drawings to final handover.

Most homeowners come to us because they need more space but don't want to move. An extension is the most direct way to get it — a larger kitchen, an additional bedroom, a proper family room — while adding value to a property you already like.

We handle extensions end to end: architectural drawings and structural calculations through our design partners, planning applications where needed, building control, and the build itself with our own team. One company, one point of contact.

Our work covers single-storey rear and side extensions, wrap-arounds, double-storey additions and garage conversions. Quotations are fixed before work begins, and any variation is priced and approved in writing before it's carried out.

Scope

What's included, and what isn't

What's included

  • Architectural drawings & structural engineering (coordinated)
  • Planning application where required
  • Building control liaison & sign-off
  • Groundworks, foundations & drainage
  • Structural steelwork
  • Brickwork, roofing & external finishes matched to the existing property
  • Glazing incl. bi-folds & rooflights
  • Full electrics, plumbing & heating
  • Plastering, flooring, joinery & decoration
  • Site protection, waste removal & final clean

What's not included

  • Kitchen units, worktops & appliances (client supply — we coordinate & install)
  • Sanitaryware & tiles (client selection)
  • Local authority fees
  • Party wall surveyor fees
  • Landscaping beyond making good

Types of work

The options we build

Single-storey rear & side

The most common extension we build: a larger kitchen-diner, a garden room, or a side return infill that squares off the plan.

Wrap-around

Rear and side combined, transforming the whole ground floor layout of a semi-detached or detached property.

Double-storey

Additional living space below and a bedroom or bathroom above, with roof and brickwork matched to the existing property.

Garage conversions

Turning an under-used garage into habitable space, with insulation, floor build-up and glazing to current standards.

Local knowledge

Planning & building regulations in our area

Many single-storey rear extensions fall under permitted development — but it depends on depth, height, boundary distance and whether the property has been extended before. In several areas we work in, those rights are restricted: in Gidea Park an Article 4 direction requires planning permission for alterations to the front and sides of the property, and in Epping Forest District conservation areas, two-storey rear and side extensions always need consent. Building regulations approval is required for every extension. Where work affects a shared boundary, notice must be served under the Party Wall etc. Act 1996. We check the position for your address at the first site visit.

Our process

How a project runs

  1. 1

    Free site visit

    We come to the property, measure up, listen to what you want and tell you honestly what is and isn't possible on your plot.

  2. 2

    Feasibility & outline budget

    A realistic cost range and a view on permitted development versus a full planning application, before you spend anything on design.

  3. 3

    Architectural drawings

    Existing and proposed drawings through our design partners, revised with you until the layout is right.

  4. 4

    Planning or permitted development

    Full application, or a lawful development certificate where the work falls under permitted development rights.

  5. 5

    Structural engineering & building regs package

    Beam and foundation calculations, and the technical drawings building control will inspect against.

  6. 6

    Party wall notices

    Where the work is within three or six metres of a shared boundary, notices are served under the Party Wall etc. Act 1996 and awards agreed before we break ground.

  7. 7

    Fixed written quotation & programme

    A detailed pricing schedule against the approved drawings, with a written start date and week-by-week programme.

  8. 8

    Pre-start condition survey

    Photographic record of the existing property and the neighbouring elevations, agreed by both sides, so there is no dispute later.

  9. 9

    Set up & groundworks

    Site protection, access route, skip and welfare in place, then foundations dug and inspected by building control.

  10. 10

    Superstructure & watertight

    Brickwork, steelwork, roof and glazing — from this point the extension is weathertight and first fix begins.

  11. 11

    First fix, plaster & second fix

    Electrics, plumbing and heating, then plastering, flooring, joinery and decoration.

  12. 12

    Handover

    Building control completion certificate, electrical certification, a clean site and our workmanship guarantee.

Typical timescales

Single-storey rear: typically 12–16 weeks on site. Double-storey or wrap-around: 16–24 weeks. Design and approvals beforehand usually add 2–4 months. A written programme is issued with every quotation.